This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside procurement for construction services to repair OR floor and bathroom leaks at East Orange VA Medical Center. The contractor must be registered in SAM and verified in SBA certification. A site visit is scheduled for October 24, 2026 at 9:00 AM ET, and no other visits will be allowed. Questions are due by October 28, 2026, and proposals are due by November 4, 2026. The contract is firm-fixed-price with a performance period of 99 calendar days. Evaluation factors include technical capability, past performance, and price. Bid guarantee is required if the proposed price exceeds $150,000. The work includes resinous flooring installation and bathroom renovation, with specific after-hours work requirements.
Proposals are due by November 4, 2026, 1:00 PM EST. The contract performance period is 99 calendar days after receiving notice to proceed. completion time: 99 calendar days after receiving notice to proceed ntp.
Payment will be made in accordance with the Prompt Payment Act. Invoices must be submitted to the address designated in the contract. the government will handle invoices according to the prompt payment act 31 **** and 5 cfr part ****.
The contractor must warranty all parts and labor for a minimum of one year from final acceptance. warranty all parts and labor for a minimum one 1 year from final acceptance longer manufacturer warranties shall be transferred to va.
The government will use comparative evaluation considering technical capability, past performance, and price. evaluations of offers and basis for award will be in accordance with far overhaul **** with appropriate considerations given to the following evaluation factors1 technical, 2 past performance, and 3 price.
Contractors must be registered in SAM and verified as SDVOSB. in order to be eligible for award, the contractor must be registered in sam www. ***. *. * with a unique entity identifier and verified certified in the small business search.
If the successful bidder fails to execute contractual documents or furnish bonds within 10 days, the contract may be terminated for default. the contracting officer may terminate the contract for default.
A site visit is scheduled for Saturday, October 24, 2026 at 9:00 AM ET. a site visit is scheduled for saturday, october 24, 2026 at 9: 00 am e. t.
Questions and requests for information must be submitted in writing no later than October 28, 2026, 1:00 PM ET. questions must be received no later than october 28, 2026, 1: 00 pm e. t.
Failure to furnish the required bid guarantee in the proper form and amount by the due date will require rejection of the offer. failure to furnish the required bid guarantee in the proper form on standard form sf 24 and amount, by the date and time specified for receipt of proposals, will require rejection of the offer.