Health And Human Services, Department Of- Indian Health Service- Div Of Engineering Svcs - Seattle
Rosebud Lift Station Construction - Amendment 2: Update the pump requirements. Refer to the SF- 30 A02 Pump Specs RLSC. 1. The purpose of this solicitation amendment A02 is to: a. Update the pump requirements. 2. Attachment J03 Tech Specs RLS
Construction of sewage and waste facilities Removal of concrete sidewalk, removal of CG, removal of concrete pavement, removal of asphalt pavement, removal of chainlink fence, abandonment of 4 dip SFM, abandonment of 8 dip sewer, demolition of existing lift station, installation of 12 SDR PVC, installation of water service line, connection to existing, installation of RJ Dip, installation of 4 45- degree RJDI bends, installation of 4 90- degree RJDI bends, installation of 4 flanged resistant wedge gate valve, installation of 4 cross, installation of 4 RJDI dust cap, installation of 4 MJ gate valve, installation of 4 dismantling joint, installation of 2 combination ARV, installation of 4 flanged swing flex check valve, installation of floats, installation of **** box culvert, installation of **** access hatch, installation of **** access hatch, installation of ventilation blowers and appurtenances, installation of 4 stainless steel vents, connection to existing force main, installation of Vaughn chopper pum
Bid Close Date: