Rotating Beacon Replacement at Henry E. Rohlsen Airport, St. Croix, U. S. Virgin Islands - The Virgin Islands Port Authority (" VIPA") hereby invites all licensed, and qualified General Construction to participate in its Invitation to Bid ( ITB) for the installation a new rotating beacon with a 45' tip- down pole and housekeeping concrete pad; and the removal of the existing beacon, beacon tower, and concrete pad at the Henry E. Rohlsen Airport, St. Croix, U. S. Virgin Islands. The project also entails the
AI helper
This is an invitation to bid for the replacement of a rotating beacon at Henry E. Rohlsen Airport, St. Croix, U. S. Virgin Islands. The project includes the installation of a new rotating beacon with a 45-degree tip-down pole and a concrete pad, as well as the removal of the existing beacon, tower, and pad. Additionally, the project involves providing and installing an emergency generator, improving the surrounding gravel pad and access road, and replacing the perimeter fence and vehicle gate. Electronic bids will be received through the eprocurement site until May 29, 2026. A mandatory virtual pre-bid meeting will be held on May 5, 2026. A non-mandatory site walkthrough will also take place on May 5, 2026. Required documents include business license, SAM debarment and certification, certificate of good standing, articles of incorporation/organization, certificate of trade name, general liability insurance, auto liability insurance, government insurance certificate, and corporate resolution. Payment and performance bonds are required within ten days of contract award. Contractor qualification statement, bid security form, proposed schedule of values, bid submittal checklist, and various certifications are also required.
The deadline for response submission is Friday, May 29, 2026, at 04:00 PM AST.
All bids will be reviewed pursuant to VIPA's procurement policies and procedures, Section IV Competitive Bidding.
The Virgin Islands Port Authority hereby invites all licensed and qualified general construction to participate.
A non-mandatory site walkthrough will take place at 12:00 PM AST on May 5, 2026.
The deadline for questions about this proposal is stated in the bid activities.
Any bid received later than the specified time shall be disqualified. Any attempt by vendors during the proposal process to contact authority personnel may result in disqualification.