Anaheim Union High School District
1- 2025- **** Anaheim High School HVAC Condenser and Evaporator Coil Replacement - Mandatory Job Walk: March 25, 2026 @9: 00 A. M. PST - LATE ARRIVALS WILL BE TURNED AWAY x000A; x000A; Provide all labor, materials, tools, equipment, and supervision necessary to remove and replace the existing evaporator and condenser coils on designated commercial rooftop HVAC units, ensuring proper operation in accordance with manufacturer specifications and applicable codes. District personnel to oversee projects. C
Bid Close Date: