The City of High Point seeks a qualified contractor to rehabilitate and recoat decorative crosswalk surfaces along MLK Jr. Drive. Work includes surface preparation, coating installation, and traffic control. Bids must be submitted by October 7, 2026, at 2:30 pm. Questions are due by September 21, 2026. The contract will be awarded to the lowest responsible, responsive bidder. The contractor warrants workmanship for one year.
Payment shall be made in accordance with the city's standard payment terms following satisfactory completion, city acceptance, and receipt of a correct invoice. payment shall be made in accordance with the city's standard payment terms following satisfactory completion, city acceptance, and receipt of a correct invoice.
The contractor shall warrant all workmanship and installed materials against defects in installation, peeling, delamination, or other failures attributable to improper installation for a period of one year from the date of final acceptance by the city. contractor shall warrant all workmanship and installed materials against defects in installation, peeling, delamination, or other failures attributable to improper installation for a period of one year from the date of final acceptance by the city.
The contract will be awarded to the lowest responsible, responsive bidder. the contract will be awarded to the lowest responsible, responsive bidder.
Contractor and/or subcontractor performing the work shall demonstrate prior experience successfully installing pavement coatings and markings. contractor and/or subcontractor performing the work shall demonstrate prior experience successfully installing pavement coatings and markings.
A delay by the contractor in achieving final completion of the work by the contract completion date will result in damages to the city, including, but not limited to, public inconvenience, obstruction in traffic, interference with business, lost revenue, and increased design professional, inspection, and administration costs. a delay by the contractor in achieving final completion of the work by the contract completion date will result in damages to the city, including, but not limited to, public inconvenience, obstruction in traffic, interference with business, lost revenue, and increased design professional, inspection, and administration costs.