USA | CA | SACRAMENTO COUNTY | SACRAMENTO | 95817 Midsize City
Warehouse Logistics/ Logistics Services
RFQ- ****: Replacement Hospital Tower Bed Lift Units
Replacement hospital tower bed lift units 14 total bed lift units, 3 carrier platform bed capacity, front loading units, minimum bed storage dimensions limit per carrier platform: 95 inches length, 44. 5 inches width, 26 inches height, maximum unit machine dimensions: 120 inches length, 55 inches width, 100 inches height, minimum unit machine carrier platform weight capacity: 600 pounds, **** pounds minimum unit total weight capacity, bridge plate adapters for each carrier platform, carrier platform loading ramps, adjustable carrier platform wheel stops, single phase, 220 volt, 15 amp, 60 hertz electrical demand, additive components for seismic anchoring if any, free on board ( FOB) destination, delivery duty paid ( DDP) shipment to Sacramento, California warehouse location managed by McCarthy Builders, repalletization of equipment components in provided warehouse space for unit transportation to installation space, transportation of equipment components from offsite delivery truck location to installation sp
AI helper
University of California Davis Health is seeking quotations for replacement hospital tower bed lift units. The deadline for submission is August 3, 2026, 5:00 PM PST. Questions are due by July 29, 2026. The award will be based on cost alone. Bidders must adhere to detailed specifications for the bed lift units, including capacity, dimensions, electrical requirements, and installation. Delivery is FOB destination, DDP to a warehouse in Sacramento, CA. Installation must be performed by union represented tradespersons. A warranty is required to commence upon facility first patient use, expected in 2030. All responses become public record unless clearly marked as trade secrets.
Quotations must be received no later than Monday, August 3, 2026, at 5:00 PM PST.
Warranty to commence on facility first patient use expected calendar year 2030.
This bid shall be evaluated based on cost alone.
Failure to prepare proposals in the required format may result in elimination from the evaluation process.