City Of Thornton
100th Avenue Multimodal Path The Project will construct a multiuse path on the north side of 100th Avenue between Riverdale Road and the existing sidewalk just west of West Forest Circle. The Project involves constructing a new detached eight- foot ( 8& rsquo;) wide concrete sidewalk approximately 1, 150 feet long along the north side of 100th Avenue. Additionally, the Project includes streetlights, American with Disabilities Act ( ADA) ramps at the northeast corner of 100th Avenue and Riverdale Road, and
Construction of a multiuse path, including a detached concrete sidewalk, streetlights, ADA ramps, and pavement markings. 1. Clearing and grubbing 2. Removal of tree, inlet, pipe, bollard, curb and gutter, concrete, asphalt mat, pull box, pedestrian push button, fence, guardrail type 3 3. Embankment material 4. Potholing 5. Topsoil offsite 6. Erosion log type 1 ( 9 inch) 7. Aggregate bag 8. Concrete washout structure 9. Storm drain inlet protection type I 10. Vehicle tracking pad 11. Reset mailbox structure type 1 12. Reset ground sign 13. Sod 14. Seeding native hydraulic 15. Mulching hydraulic 16. Soil retention blanket ( straw/coconut) 17. Biodegradable class 1 noxious weed management 18. Wildlife biologist 19. Aggregate base course class 6 20. Reconditioning 21. Hot mix asphalt patching 22. Concrete pavement ( 8 inch) 23. Riprap ( 6 inch) 24. Hand rail **** inch reinforced concrete pipe complete in place **** inch reinforced concrete pipe complete in place **** inch reinforced concrete pipe complete
Bid Close Date: