Horry County Government
**** Mistle Court Myrtle Beach SC **** Single Family Home Rehabilitation **** Mistle Court Myrtle Beach SC **** Single Family Home Rehabilitation
Bid Close Date:
Lot 65: Materials to remove and dispose of floor covering
Lot 66: Labor to remove and dispose of floor covering
Lot 73: Materials to remove and dispose of floor covering
Lot 74: Labor to remove and dispose of floor covering
Lot 1: Materials to replace entire roof Per Code. Remove existing shingles and felt down to roof deck ( 2 layers). Install synthetic felt paper, ridge vent, drip edge, exhaust, plumb & vent boots. Use architectural shingle rated for 110 mph wind minimum.
Lot 2: Labor to replace entire roof Per Code. Remove existing shingles and felt down to roof deck ( 2 layers). Install synthetic felt paper, ridge vent, drip edge, exhaust, plumb & vent boots. Use architectural shingle rated for 110 mph wind minimum.
Lot 3: Materials to pressure wash exterior, to include siding, fascia & soffit. Remove vines, mold and algae.
Lot 4: Labor to pressure wash exterior, to include siding, fascia & soffit. Remove vines, mold and algae.
Lot 5: Materials to install a 6- panel metal- clad pre- hung door with lockset. Include interior casing - Utility Room.
Lot 6: Labor to install a 6- panel metal- clad pre- hung door with lockset. Include interior casing - Utility Room.
Lot 7: Materials to install a 6- panel metal- clad pre- hung door with lockset. Include interior casing - Front Door
Lot 8: Labor to install a 6- panel metal- clad pre- hung door with lockset. Include interior casing - Front Door
Lot 9: Materials to install a mid- view storm door - Front Entry
Lot 10: Labor to install a mid- view storm door - Front Entry
Lot 11: Materials to install three ( 3) hollow core 6- panel pre- hung interior doors. Include privacy set for each bedroom interior door.
Lot 12: Labor to install three ( 3) hollow core 6- panel pre- hung interior doors. Include privacy set for each bedroom interior door.
Lot 13: Materials to remove & dispose of laminate flooring
Lot 14: Labor to remove & dispose of laminate flooring
Lot 15: Materials to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 16: Labor to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 17: Materials to install vinyl plank flooring
Lot 18: Labor to install vinyl plank flooring
Lot 19: Materials to install 3/4" round trim
Lot 20: Labor to install 3/4" round trim
Lot 21: Materials to remove & dispose of laminate flooring
Lot 22: Labor to remove & dispose of laminate flooring
Lot 23: Materials to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 24: Labor to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 25: Materials to install vinyl plank flooring
Lot 26: Labor to install vinyl plank flooring
Lot 27: Materials to install 3/4" round trim
Lot 28: Labor to install 3/4" round trim
Lot 29: Materials to install pre- finished base cabinets
Lot 30: Labor to install pre- finished base cabinets
Lot 31: Materials to install pre- finished wall cabinets
Lot 32: Labor to install pre- finished wall cabinets
Lot 33: Materials to install laminate countertops
Lot 34: Labor to install laminate countertops
Lot 35: Materials to install a double bowl stainless sink with single lever faucet to include new supply lines and drain assembly
Lot 36: Labor to install a double bowl stainless sink with single lever faucet to include new supply lines and drain assembly
Lot 37: Materials to prep & paint walls ceiling & trim. Apply sufficient coats of paint to cover.
Lot 38: Labor to prep & paint walls ceiling & trim. Apply sufficient coats of paint to cover.
Lot 39: Materials to install a 4' LED flush mount light fixture to replace existing light fixture.
Lot 40: Labor to install a 4' LED flush mount light fixture to replace existing light fixture.
Lot 41: Materials to install over the range exhaust hood, non- ducted
Lot 42: Labor to install over the range exhaust hood, non- ducted
Lot 43: Materials to install a pre- hung 6- panel pantry door, to include passage set
Lot 44: Labor to install a pre- hung 6- panel pantry door, to include passage set
Lot 45: Materials to install vinyl plank flooring
Lot 46: Labor to install vinyl plank flooring
Lot 47: Materials to install 3/4" round trim
Lot 48: Labor to install 3/4" round trim
Lot 49: Materials to patch holes, prep & paint walls, ceiling and trim. Apply sufficient coats of paint to cover.
Lot 50: Labor to patch holes, prep & paint walls, ceiling and trim. Apply sufficient coats of paint to cover.
Lot 51: Materials to install a 4' vanity with top, integrated sink and faucet. To include supply lines and drain assembly.
Lot 52: Labor to install a 4' vanity with top, integrated sink and faucet. To include supply lines and drain assembly.
Lot 53: Materials to install toilet paper holder
Lot 54: Labor to install toilet paper holder
Lot 55: Materials to remove & dispose of laminate flooring
Lot 56: Labor to remove & dispose of laminate flooring
Lot 57: Materials to patch hole, prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 58: Labor to patch hole, prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 59: Materials to install vinyl plank flooring.
Lot 60: Labor to install vinyl plank flooring.
Lot 61: Materials to install 3/4" round trim
Lot 62: Labor to install 3/4" round trim
Lot 63: Materials to prep & paint walls, ceiling and trim. Apply sufficient coats of paint to cover.
Lot 64: Labor to prep & paint walls, ceiling and trim. Apply sufficient coats of paint to cover.
Lot 65: Materials to remove and dispose of floor covering
Lot 66: Labor to remove and dispose of floor covering
Lot 67: Materials to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 68: Labor to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 69: Materials to install vinyl plank flooring
Lot 70: Labor to install vinyl plank flooring
Lot 71: Materials to install 3/4" round trim
Lot 72: Labor to install 3/4" round trim
Lot 73: Materials to remove and dispose of floor covering
Lot 74: Labor to remove and dispose of floor covering
Lot 75: Materials to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 76: Labor to prep & paint walls, ceiling & trim. Apply sufficient coats of paint to cover.
Lot 77: Materials to install vinyl plank flooring
Lot 78: Labor to install vinyl plank flooring
Lot 79: Materials to install 3/4" round trim
Lot 80: Labor to install 3/4" round trim
Lot 81: Materials to install bi- fold closet door
Lot 82: Labor to install bi- fold closet door
Lot 83: Materials to install a 2- ton split HVAC system, Per Code. Connect to existing duct work.
Lot 84: Labor to install a 2- ton split HVAC system, Per Code. Connect to existing duct work.
Lot 85: Materials to install new copper line set with cover, from air handler to condensing unit
Lot 86: Labor to install new copper line set with cover, from air handler to condensing unit
Lot 87: Materials to install new ceiling registers
Lot 88: Labor to install new ceiling registers
Lot 89: Materials to install new breakers, disconnect and thermostat ( 1 each)
Lot 90: Labor to install new breakers, disconnect and thermostat ( 1 each)
Lot 91: Materials to provide storage pod for homeowner belongings during construction
Lot 92: Materials to provide for trash removal
Lot 93: Materials to provide Porta- John
Lot 94: Materials to provide for a permit