Fayetteville Public Works Commission-NC
**** - P. O. Hoffer Water Treatment Facility Glenville Lake Water Treatment Facility Post- Filter GAC Adsorption Facilities Contract No. 67
Construct a GAC facility to include twelve 12 postfilter GAC contactors, a filter gallery, an electrical room, an intermediate pump station with four 4 vertical turbines can pump, and a backwash pump station with three 3 vertical turbine can pumps. Install yard piping and make connections to existing structures to provide a fully functional postfilter GAC system. Complete building, electrical, instrumentation, and control systems upgrades associated with this work. Startup and commission all new facilities and associated equipment. Construct a GAC facility to include ten 10 dualcell postfilter GAC contactors, a filter gallery, and an electrical room. Construct an intermediate pump station with three 3 vertical turbines can pump and a backwash pump station with two 2 vertical turbine can pumps. Construct a chemical injectionmixing vault and splitter weir box. Install yard piping and make connections to existing structures to provide a fully functional post filter GAC system. Complete building, electrical, inst