05/23/2025 - USA | TX | LEON COUNTY | CENTERVILLE | 75833 Small City
Leon County - TX
2022- 261 Centerville Tower Shelter Project
Acquisition and installation of a prefabricated concrete communications shelter, external emergency generator, 1, 000- gallon propane tank, foundations, and grounding compliant with Motorola R56 standards and guidelines for communication sites. a new 10foot wide by 12foot deep by 9foot high publicsafetygrade prefabricated concrete communications equipment shelter, an engineered foundation, with stamped professional engineer PE drawings, constructed onsite for shelter placement, an emergency power supply system EPSS with a 25kilowatt kW minimum external generator with concrete foundation, placed near the shelter, in accordance with all state and local requirements, a 1, 000gallon propane tank installed in the shelter compound, a concrete propane tank foundation inside the fenced compound, a ground halo system installed around the new shelter with connections to the existing ground ring, all grounding will be in accordance with motorola r56 standards, grounding electrode system with required ground rods, test w
AI helper
Sealed proposals are requested for the acquisition and installation of a communications shelter, generator, propane tank, foundations, and grounding. Proposals are due September 15, 2021, by 3:00 PM, to the Leon County Auditors Office. Bidders must comply with all applicable federal, state, county, and local laws, including safety, emission, and noise control requirements. The selected proposer will be responsible for the specification of materials and equipment, and for managing the storage of all materials. The proposal must include a schedule and participation in regularly scheduled meetings throughout the project. Comprehensive maintenance services for the expected lifecycle of the equipment (10 years after system acceptance date) must be included. The site is located at **** County Road 317, Centerville, Texas, **** documents required, participation criteria, process stages, cost of the dispute, deadlines for clarification and objection, exclusivity for certain types of companies (if any), deadline for starting services, deadline for total delivery of services are not mentioned.