Green Trails Mud
Construction of Water Well No. 3 for Green Trails MUD The work includes construction of one ( 1) water well, including vertical turbine pump; motor control center modifications, underground and aboveground conduit and wire, control integration, instrumentation, existing equipment demolition, and service entrance rack modifications; disinfection equipment and modifications; ground storage tank roof modifications; associated electrical, structural, controls, and piping; protective coatings; site improvements
Construction of water well no. 3 Construction of one ( 1) water well, including vertical turbine pump; motor control center modifications, underground and aboveground conduit and wire, control integration, instrumentation, existing equipment demolition, and service entrance rack modifications; disinfection equipment and modifications; ground storage tank roof modifications; associated electrical, structural, controls, and piping; protective coatings; site improvements including concrete access roadway extension, drainage swales, fencing and gate, and site grading hydro mulch seeding hpt temporary relocation work, right of way work and all additional items shown on the construction plans or needed for a completely functional water plant and water well.
Bid Close Date: