City Of Syracuse - NY
Bid City of Syracuse Former Developmental Center Site Development
Site development at the former developmental center 1. mobilize and set up staging areas. 2. install all applicable erosion and sediment control measures identified on the erosion sediment control plans, in the stormwater pollution prevention plan swppp, and thecontract documents. 3. remove existing site utilities, caissons, structures, etc. as identified on the sitedemolition plans. coordinate with local utilities as required to complete the work. 4. review the phasing plans for the scope of work. 5. regrade the site and perform all earthwork operations to accommodate the proposedwork. 6. install the new site utilities and tie into the existing utilities as required. provide allservices as indicated on the contract drawings. coordinate with all utility companies asrequired. 7. construct the new city street rows generally consisting of a twolane road sectionprimary, primary entrance, secondary street sections, associated parking and bikelanes, curbing, landscape green area with tree plantings, stormwater mana
Bid Close Date: