Lot 1: Planned Work - Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator up to 20, 000 lbs.
Lot 2: Emergency Response Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator up to 20, 000 lbs.
Lot 3: Planned Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator over 20, 000 lbs. up to 75, 000 lbs.
Lot 4: Emergency Response Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator over 20, 000 lbs. up to 75, 000 lbs.
Lot 1: Planned Work - Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator up to 20, 000 lbs.
Lot 2: Emergency Response Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator up to 20, 000 lbs.
Lot 3: Planned Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator over 20, 000 lbs. up to 75, 000 lbs.
Lot 4: Emergency Response Work- Three- man crew consisting of a field superintendent and two ( 2) trained laborers, truck, rubber tire backhoe/mini- excavator over 20, 000 lbs. up to 75, 000 lbs.
Lot 5: Planned Mobilization/Demobilization
Lot 6: Emergency Mobilization/Demobilization
Lot 7: Additional Operator and Excavator up to 24, 000 lbs.
Lot 8: Additional Operator and Excavator 24, 001- 40, 000 lbs.
Lot 9: Additional Operator and Excavator 40, 001- **** lbs.
Lot 10: Additional Operator and Excavator 60, 001- 90, 000 lbs.
Lot 11: Air Compressor
Lot 12: Jack Hammer
Lot 13: Light Plant
Lot 14: 7 CY Dump Truck Including Truck Driver
Lot 15: 18 CY Dump Truck Including Truck Driver
Lot 16: Hydraulic Jack Hammer
Lot 17: Dragline Mats
Lot 18: Pavement Breaker
Lot 19: Provide and maintain 6" bypass pumping - Day Rate
Lot 20: Provide and maintain 8" bypass pumping - Day Rate
Lot 21: Mobilization/Demobilization for bypass pumping
Lot 22: Bypass Road Crossings
Lot 23: Provide and Install Concrete Sidewalk minimum 4" Thick 1*
Lot 24: Provide and Install Concrete Paving minimum 4" Thick ( Driveway and Surface Paving) 1*
Lot 25: Provide and Install Concrete Traffic Surface minimum 8" Thick, including 8" base per specifications 1*
Lot 26: Provide and Install Asphalt Traffic Surface minimum 4" thick, including 8" base per specifications 1*
Lot 27: Provide and Install Asphalt Traffic Surface minimum 6" thick, including 8" base per specifications 1*
Lot 28: Provide and Install Sod 1*
Lot 29: Provide and maintain 8" well point pumping - Day Rate
Lot 30: Provide and maintain 12" well point pumping - Day Rate
Lot 31: Mobilization/Demobilization for well point system
Lot 32: Provide, install and maintain well points and suction and discharge headers
Lot 33: Select Fill ( Delivered to Job Site)
Lot 34: Gravel - SB2 ( Delivered to Job Site)
Lot 35: Sub- Contractor Actual Invoice + 10% Rentals Actual Invoice + 5% Materials Actual Invoice + 5%