Central Florida Tourism Oversight District - FL
ECEP Cooling Tower Basin Improvements
Cooling tower basin improvements Provide and install sluice gates at 3 existing basin openings in between cooling tower cells 3 and 4; Provide and install a 24 cwr bypass pipe between the north side header to the south side header; Provide and install butterfly valves at the connection to the existing north header and at the connection to the existing south header; Replace the pneumatic actuators with electric actuators on the existing cooling tower inlet valves for cooling towers 1, 2, and 3; Replace the butterfly valve and pneumatic actuator with an electric actuator at the tower inlet for cooling tower 4; Provide and install isolation butterfly valves in the main condenser water header between the takeoffs for ct 1 and ct 2, between the takeoffs for ct 2 and ct 3, and between the takeoffs for ct 3 and ct 4; Provide and install solenoid valves at the chemical treatment discharge pipes for each cooling tower basin; Provide control modifications for operation of the sluice gates, tower isolation valves, heade
Bid Close Date: