Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e-
procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e-
procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** The **** Reclamation Project will reclaim approximately 77 acres of areas adversely affected by past coal mining
operations. The reclamation task of Stony Point AML Reclamation Project is divided into five ( 5) earthwork areas with acidic refuse, mine spoil ridges, and mining impoundments. Work includes backfilling existing mine pits/silt ponds with adjacent mine spoils. All
water below 6. 0 pH shall be treated in strict accordance with KYAML technical specifications. A
pump to dewater the pits is likely needed. A domestic & mining debris disposal bid item is included for removing and properly disposing of all items that qualify. Silt Fence and Silt Traps are included to control all sediment from the site during construction activities. Ditches lined with ECB and Class II and Class III channel lining are proposed to properly handle surface
waters within the construction limits as designed. Likewise, 18- inch HDPE culverts are included to properly handle surface
waters as designed. ECB Anchors will be installed as needed to secure in place erosion control blanket in proposed ditches and as a secondary silt control measure.
Filter Fabric is included to use in aggregate ditches to increase stability and reduce sediment. Permanent Low
Water Crossings are proposed for stream crossings in some areas. Revegetation efforts include Seed B