USA | AK | ANCHORAGE COUNTY | ANCHORAGE | 99510
Midsize City
Boiler and DHW Replacement, # 27- RFQ- 005, Anchorage, AK The Alaska Housing Finance Corporation is requesting bids for the removal and replacement of two existing boilers and associated water heaters at the sites listed above.
Boiler and domestic hot water ( DHW) replacement at two Anchorage, AK sites Phase 1: Removal and disposal of one Triangle Tube INSC199 wall- hung combination water heater/boiler and installation of one IBC CX199 combination water heater/boiler or approved equivalent, including new flue exhaust connection, fresh air intake, condensate neutralizer and pump, isolation ball valves, thermometer, pop- off relief valve, drain valve, and wiring. Phase 2: Removal and disposal of one Weil- McLain Ultra 105 wall- hung boiler and one Triangle Tube Smart 80 indirect water heater, and installation of one IBC VX199 boiler and one IBC DTL65 Interstor indirect water heater or approved equivalent, including new circulating pumps, backflow preventer, pressure reducing valve, DHW mixing valve, spiro vent, expansion tanks, dielectric unions, thermometer, condensate neutralizer and pump, drain pan, zone controller, and new exhaust and fresh air intake piping.
AI helper
RFQ for removal and replacement of two boilers and associated water heaters at two Anchorage sites (**** Stella Place and **** Peck Ave). Work includes demolition, installation of new IBC boilers and water heaters, piping, pumps, and electrical wiring. Completion by November 15, 2026. Proposals due October 15, 2026 at 4:00 PM. Award to lowest responsive and responsible offeror. Site visit recommended; contact Nathan Bodewitz. Davis-Bacon wage rates apply. Alaska business license required. Work funded by HUD.
Project must be completed on or before November 15, 2026. The notice states: must be completed on or before november 15, 2026.
Contract award will be to the lowest responsive and responsible offeror. The document states: contract award to the lowest responsive and responsible offeror will be made in the amount of the total quote amount.
An Alaska business license is required at time of award. The notice states: an alaska business license is required of contractors who do business in alaska at time of award.
A site visit can be scheduled. The document states: please contact nathan bodewitz at **** ***@***. *. * to schedule a site visit.
For procurements over $25,000, a protest may be filed with the contract compliance officer. The notice states: an interested party may protest the award by filing a written protest with the contract compliance officer.
Failure to sign and date the RFQ form will result in rejection. The document states: failure by offeror to sign and date this rfq form will result in ahfc rejecting the offerors quotation as nonresponsive.