Interior, Department Of The- National Park Service- Ser South Mabo ( 54000)
Water Meter
Replace backflow preventer on lighthouse road at c - replace backflow preventer on lighthouse road at cape hatteras national seashore
Replacement of backflow preventer and installation of an insulated fiberglass cover with a concrete pad. Base Bid: Removal of existing underground backflow preventer and water meter, abandonment of existing utility vault, installation of new water connection and backflow preventer, coordination of new Dare County water meter installation, and provision of an enclosure. Option 1: Provision of a heated enclosure with a moisture- resistant heater and coordination of new power supply.
Bid Close Date: