Contractors must be prequalified as a gas line utility contractor for Trussville Gas and Water by submitting a prequalification application to the Engineering Department no later than 4:00 p. m. on May 7, 2026. Bids will be publicly opened and read on May 21, 2026, at 10:00 a. m. A certified check or bid bond of not less than five percent (5%) of the total bid, but no more than $10,****, is required for bids of $20,**** or more. Contractors must be licensed under Title 34 Chapter 8, Code of Alabama, **** Gas and Water reserves the right to reject any or all bids and to hold bids for 60 days.
The bid notice does not explicitly state a delivery deadline for the project itself, but it does mention that bids will be received until May 21, 2026, at 10:00 a. m. The bid notice states, o bid will be received after the time set forth below.
The bid notice states, o accept any bid considered advantageous to the owner.
The bid notice states, contractor must be prequalified as a gas line utility contractor for trussville gas and water. and contractor must be licensed under the provisions of title 34 chapter 8, code of alabama, ****.
The bid notice states, plans, specifications and contract documents for the project described above are open to public inspection at trussville gas and water engineering dept. , **** green drive, trussville, alabama 35173. This implies a possibility for inspection but does not mandate a preliminary visit.
The bid notice does not mention the submission of samples.