Town Of Plymouth
Gravel Shoulder/ Turf Restoration
Town of Plymouth - 2026 Miller Road Reconditioning- The Project includes the following Work: Pulverize and reshape approximately 14, 500 SY of asphalt pavement 250 LF of 12- inch, 24- inch and 48- inch diameter culvert replacements 200 LF of curb and gutter 2, 000 tons of supplemental base course 3, 300 tons of asphaltic concrete pavement 11, 000 L. F. of 3- foot gravel shoulder Erosion control and turf restoration Bid alternate to excavate and lower one vertical curve ( approximately 400 CY of earthwork) B
Bid Close Date: