Lot 1: Audio- video pre- construction and post- construction video
Lot 2: Sediment and erosion control
Lot 3: Trench excavation and backfill ( 0- 10')
Lot 4: Crushed rock foundation
Lot 5: Storm sewer junction box
Lot 6: Sewer service connections
Lot 7: Sewer service line ( 4")
Lot 8: 8" by trenchless construction
Lot 9: 10" by trenchless construction
Lot 10: Sewer flow control
Lot 11: Point repair
Lot 12: Point repair
Lot 13: Television inspection ( cctv) pre- construction
Lot 14: Television inspection ( cctv) post- construction
Lot 15: Sewer leakage test (
Lot 16: ( 4- foot dia. ) sanitary sewer manhole ( 0- 6 ft)
Lot 17: Extra depth manhole wall ( 4- foot dia. )
Lot 18: Manhole testing
Lot 19: Sanitary sewer manhole rehabilitation
Lot 20: Invert and bench reconstruction
Lot 21: Manhole frame and lid replacement ( rehabilitated manhole)
Lot 22: Removing lamphole
Lot 23: Removing manhole
Lot 24: High density polyethylene ( hdpe ) pipe ( 10")
Lot 25: Steel encasement by trenching ( 10" carrier pipe)
Lot 26: Construction staking ( construction survey)
Lot 27: Gps as- built survey
Lot 28: Construction signing and traffic control
Lot 29: Mobilization
Lot 30: Clearing and grubbing
Lot 31: Remove and replace curb and gutter
Lot 32: Remove and replace driveway ( concrete)
Lot 33: Pavement cut & permanent repair ( concrete)
Lot 34: Remove and replace sidewalk
Lot 35: Solid slab sodding