USA | PA | CUMBERLAND COUNTY | MECHANICSBURG Small City
Dept Of Defense- Dept Of The Navy- Navsup- Navsup Weapon Systems Support- Navsup Wss Mechanicsburg- Navsup Weapon Systems Support Mech
Molded Insert/ Inspection
53-- molded insert - contact information 4 **** wwj 717- 605- **** ***@***. *. * item unique identification and valuation ( jan 2023) 19 higher- level contract quality requirement ( navicp review feb ****)( feb ****) 1 see specificati
fastening devices
AI helper
The bid notice states that the final delivery of material is due within 210 days. It also mentions that the submission of all certification data (CDRLs) is required 20 days prior to delivery, and PNNSY review and acceptance of certification CDRLs is within 6 working days after receipt. Final delivery of material 210 days and submission of all certification data cdrls 20 days prior to delivery. pnsy review acceptance of certification cdrls 6 working days after receipt
The bid notice states that there is a one-year (365 days) warranty after the last delivery under the contract. one year 365 days after the last delivery under this contract
The bid notice requires contractors to provide and maintain a quality system in accordance with ISO ****, with specific calibration system requirements. An alternate acceptable quality system is in accordance with MIL-I-****. The contractor furnishing items under this contract purchase order must provide and maintain a quality system in accordance with iso **** as amplified or modified herein, with the calibration system requirements of iso **** or ansi **** with iso **** quality system in accordance with mil i ****, with the calibration system requirements of mil std ****, is acceptable as an alternate.
The bid notice indicates that material sampling is part of the final inspection process, with lot acceptance based on zero defects and lot rejection based on one defect. The sample size is determined by applicable military specifications, standards, federal specifications, or drawings. material sampling material must be inspected for form, fit, and function. lot acceptance must be based on zero defects and lot rejection based on one defect.
Bid Close Date: