Lot 1: Mobilization
Lot 2: Surveying and construction staking
Lot 3: Prepare swppp
Lot 4: Clearing & grubbing
Lot 5: Prepare water source
Lot 6: Excavation
Lot 7: Leachate collection and disposal
Lot 8: Clay liner
Lot 9: Bentonite
Lot 10: Geosynthetic clay liner ( gcl)
Lot 11: Smooth geomembrane
Lot 12: Textured geommebrane
Lot 13: Composite drainage net ( cdn)
Lot 14: Geotextile 8 oz
Lot 15: Geotextile 16 oz
Lot 16: Reinforced polyethylene cover ( rpc)
Lot 17: Leachate rock
Lot 18: 4" slotted high density polyethylene ( hdpe) pipe
Lot 19: 6" slotted high density polyethylene ( hdpe) pipe
Lot 20: 6" solid high density polyethylene ( hdpe) pipe
Lot 21: 24" double wall corrugated hdpe
Lot 22: Cleanout
Lot 23: Double ring infiltrometer test
Lot 24: Metal posts
Lot 25: Erosion control
Lot 26: Temporary fiber rolls
Lot 27: Sampling and analysis day
Lot 28: Aggregate base
Lot 29: Facing class rip rap
Lot 30: 6" hdpe ball valve
Lot 31: Gas extraction well borehole
Lot 32: Gas extraction well
Lot 33: Gas extraction wellhead
Lot 34: 6x6x4 TEE
Lot 35: 6x6x6 TEE
Lot 36: Miscellaneous fittings ( elbows, nipples, sample ports, clamps, etc. )
Lot 37: Bore seals
Lot 38: Operations layer