BidHits™ uses cookies to provide an individualized service and care for the privacy and protection of shared data.
By browsing this site, we understand that you agree to the terms of our Privacy Policy.
Oar Government Bids & RFPs
Government bid alerts, regional filters, and fast access to documents
Monitor more sources with less manual work. 14-day free trial, no auto-charge.
90% recommend BidHits™ (1051 real users, 05/16/2026).Methodology
58-- blanker, interferenc, in repair/modification of - item unique identification and valuation ( jan 2023) 19 higher- level contract quality requirement 8 inspection and acceptance of supplies 26 time of delivery ( june ****) 20 s
Repair, testing, and inspection of electronic components.
AI helper
This is a Statement of Work (SOW) for the repair, testing, and inspection of electronic components. The contractor is responsible for providing all necessary facilities, labor, materials, parts, and test equipment to return specified items to a Ready For Issue (RFI) condition. Key requirements include adherence to OEM technical drawings and publications, a quality system compliant with ISO **** or SAE ****, and a calibration system meeting ANSI/NCSL **** or ISO 10012-1. The SOW also details procedures for Beyond Economical Repair (BER), Missing On Induction (MOI) items, and Over and Above Repair (OAR) situations, all requiring contractor notification and government approval. Parts and materials must be new and in accordance with applicable drawings and specifications, with specific controls for purchased material. The contractor must maintain a configuration management plan and ensure proper storage of items. The repair source and location must be specified, and inspection will be accomplished on the contractor's equipment.
The bid notice states that the time of delivery is June ****.
The bid notice mentions wide area workflow payment instructions jan 2023 and invoice and receiving report combo tbd.
The bid notice states that the warranty is for 365 days after delivery of the unit, with a claim period of 45 days from when a defect was found.
The contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO **** SAE ****.
If the contractor does not meet the applicable repair turnaround time (RTAT) requirement, consideration will be assessed and subject to negotiation.
59-- electronic componen, in repair/modification of - contact information 4 n731, 47 **** 215- 697- **** ***@***. *. * item unique identification and valuation ( jan 2023) 19 higher- level contract quality requirement 8 x time of delivery ( june ****) 20
electrical and electronic assemblies, boards, cards, and associated hardware
AI helper
This is a solicitation for the repair of electronic components, specifically engine control units (PN ****). The repair and testing must be performed in accordance with specified technical drawings and service bulletins to meet industry standards. Contractors must submit a quote including either firm fixed price or T&E pricing, with estimated repair costs. The contractor is responsible for providing all necessary facilities, labor, materials, parts, and test equipment. Quality assurance requirements include adherence to ISO 9001/AS9100 standards and a calibration system compliant with ANSI/NCSL **** or ISO **** management and proper storage of items are also required. The notice details procedures for handling items that are beyond economical repair (BER), missing on induction (MOI), or require over and above repair (OAR). All repairs must be performed at the contractor's facility. The contractor must maintain a quality system and provide documentation for government review. Receiving inspection of purchased parts and material is mandatory.
The bid notice mentions ime of delivery June **** and a requested RTAT of 60 days, but a specific final delivery deadline for this procurement is not unequivocally identified.
The bid notice states that there is a warranty of supplies of a noncomplex nature for 1 year after date of delivery and 45 days after discovery of defect.
The contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO **** SAE AS9100. The contractor's quality management system program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality.
The bid notice does not mention any requirement or possibility for a site visit.
The bid notice does not indicate that samples are required.
SEAT, AIRCRAFT - CONTACT INFORMATION 4 **** T1L 215- 697- **** ***@***. *. * ITEM UNIQUE IDENTIFICATION AND VALUATION ( JAN 2023) 19 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS ( JAN 2023) 16 Invoice and Receiving Report Combo
Repair of aircraft seat
AI helper
This is a repair requirement for aircraft seats (**** 1BA0, P/N 7RH **** ****). Contractors must submit a quote with either firm fixed price or T&E pricing, including estimated costs to repair and proposed repair turnaround time (RTAT). The repair process includes inspection, component repair/replacement, reassembly, and testing to return units to a ready-for-issue (RFI) condition. Contractors are responsible for providing necessary facilities, labor, materials, parts, and test/tooling equipment. All repairs must comply with specified drawings and repair manuals. Changes to manuals, drawings, or specifications require prior approval from the Procuring Contracting Officer (PCO). Beyond Economical Repair (BER) items are those where repair cost exceeds 75% of the production quantity price. Missing On Induction (MOI) items require notification to DCMA. Over and Above Repair (OAR) items may be subject to equitable adjustment. New parts and materials must be used unless otherwise approved. A quality system compliant with ISO **** or SAE **** and a calibration system meeting ANSI/NCSL **** or ISO **** are required. Configuration management must be maintained per NAVSUP WSS clause NAVICPIA18. Packaging must comply with MIL STD 2073. The contractor shall specify the source division and location of repair. Inspection will be accomplished on the contractor's equipment.
The bid notice states that the resultant contractual delivery requirement is measured from asset return to the date of asset acceptance under the terms of the contract, and the contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract. The notice also mentions that the contractor must accurately report all transactions by the end of the fifth regular business day after receipt.
The bid notice mentions wide area workflow payment instructions Jan 2023 and invoice and receiving report combo tbd, but does not provide specific payment terms.
The contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO **** SAE AS9100. The contractor's quality management system program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL ****, ISO **** or an equivalent calibration program acceptable to the Government.
The bid notice does not mention any requirement or possibility for a site visit.
The bid notice does not mention any requirement for sample submission.
15-- COVER, ACCESS, AIRCRA, IN REPAIR/MODIFICATION OF - CONTACT INFORMATION 4 **** T2Q 215- 697- **** ***@***. *. * ITEM UNIQUE IDENTIFICATION AND VALUATION ( JAN 2023) 19 INSPECTION AND ACCEPTANCE OF SUPPLIES 26 x x WIDE AREA WORKFLOW PAYM
Repair, testing, and inspection of aircraft structural components.
AI helper
This is a repair requirement under BOA **** for aircraft structural components. The repair turnaround time (RTAT) is measured from asset return to the date of asset acceptance. The induction expiration date is 365 days after contract award. The contractor is responsible for providing necessary facilities, labor, materials, parts, and test and tooling equipment. Repairs must be performed in accordance with specified drawings and repair manuals. Changes to manuals or drawings require procuring contracting officer (PCO) approval. Items determined to be beyond economical repair (BER) require written concurrence from DCMA. Missing on induction (MOI) shop replaceable assemblies (SRAs) are not included in the contract price and require DCMA verification. Over and above repair (OAR) items may be subject to equitable adjustment and require PCO approval. The contractor is responsible for supplying all necessary parts and materials, which must be new and in accordance with applicable drawings and specifications. A quality system conforming to ISO **** or SAE **** is required. The contractor shall maintain a calibration system meeting ANSI/NCSL ****, ISO ****, or equivalent. Configuration management must be in accordance with NAVSUP WSS configuration management clause NAVICP-IA18. Proper enclosed warehouse storage is required.
The bid notice states that the induction expiration date is 365 days after the contract award date. Any asset received after this date is not authorized for repair without bilateral agreement between the contractor and NAVSUP WSS contracting officer. The bid notice also mentions a required RTAT (Repair Turnaround Time) which is measured from asset return to the date of asset acceptance, but does not specify a fixed number of days for this. The bid notice also mentions a throughput constraint where the contractor must provide a throughput constraint for each NSN s. total assets to be repaired monthly after initial delivery commences x month contractor fill in. a throughput of per month reflects no throughput constraint.
The bid notice mentions wide area workflow payment instructions and invoice and receiving combo type tbd, but does not provide specific details on payment terms.
The bid notice states that the contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO **** SAE AS9100. The contractor's quality management system program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. The contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL ****, ISO **** or an equivalent calibration program acceptable to the government.
The bid notice does not mention any requirement or option for a site visit.
The bid notice does not mention any requirement for sample submission.
Vaisala Ultrasonic WindSensor - Notice Number: ****- 26- **** Notice Type: Sources Sought Title: Vaisala Ultrasonic Wind Sensors Response Date: May 14, 2026 This is a SOURCES SOUGHT and is not a pre- solicitation announcement. The purpose of thi
Vaisala ultrasonic wind sensors
AI helper
This is a sources sought notice from the National Oceanic and Atmospheric Administration (NOAA) to identify potential qualified businesses capable of providing Vaisala WMT700 series heated 2D sonic anemometers. The purpose is to gather market information for acquisition decisions. The anemometers are required for collecting meteorological data to determine atmospheric flow and stability for emergency response plume modeling. Essential salient features include specific performance ranges for wind speed and direction, power specifications, and mechanical specifications. Interested firms must provide a written narrative (max 3 pages) and documentation supporting their capability and experience, including firm name, address, point of contact, telephone number, UEID, CCR cage number, and business type/size. All contractors must be registered and active in the System for Award Management (SAM). This notice is for information only and does not constitute a commitment to procure. Delivery is required within 60 days from the date of award.
The bid notice states that delivery is required within 60 days from the date of award.
Interested firms shall provide, in writing, a brief narrative no more than 3 pages in length and documentation to support your firms capability and experience meeting the requirements herein and include your firms name, address, point of contact, telephone number, ueid number, ccr cage number, business type and size i. e. , small, large, non profit, educational, etc. . Any response that does not include this information will not be considered.
Add keywords for your products or services. Smart Search helps catch related opportunities beyond exact matches.
2
Start the trial and receive alerts
Use the 14-day free trial and get email alerts with documents or official posting links.
3
Tune your feed
Adjust keywords, regions, email schedule and email style. Use map view and filters when you want to explore.
What our users say
90% recommend BidHits™ (1051 real users, 05/16/2026).Methodology
I closed deals thanks to the information gathered by the search tool. There’s no need to research across multiple media outlets.
J. Comunale
They deliver on their promises. The information is simple and straightforward.
G. G
They provide information on a wide and varied range of purchasing processes. All the necessary details are also included.
J. M. Defelitto
All bids related to our product are captured by you and sent to us. In my opinion, it’s perfect—broad coverage and easy searches across the bid documents.
R. M. Ferreira
Very good and accurate information about the tenders: consistent and precise.
G. R. Ortiz
The idea of ​​using a keyword and sending the information by email is very good.
We selected the most helpful reviews from real users. Order may change periodically.
The tool is truly effective at scanning bid documents, efficiently delivering bids.
G. D. Reis
It encompasses all portals in one place.
G. Ferrea
It helps me identify areas of opportunity and find bids related to my work area.
I. J. R. Beltran
Practicality, speed, trust, and credibility—that’s what the work conveys. The information is precise and sharply targeted.
N. De Lima
Excellent information. Just what I was looking for.
L. H. Borrelli
It gives me information on bids that interest me. It's easy to find bids.
A. Armenta
They notify me promptly when a contest is published.
L. Salazar
The search tool really works and satisfactorily meets our needs.
D. L. Cairuga
The information helps me submit my bids on time for bids, and I also have readily available information on upcoming bids. So far, I am very satisfied with what I have received.
M. A. Z. Armenta
The filtering is well done, and I also receive the bids I can participate in directly in my email.
E. B. Da Fonseca
Excellent platform to help promote and expand the reach of your work.
C. Merino
I’m notified immediately about every bid that opens in my area. It really helps my work.
BidHits™ is a government bid search engine that monitors official portals and brings relevant federal, state and local opportunities into one place. You can search on the site and receive scheduled email alerts.
Enter your email and activate the trial. For 14 days you can use the main features, including alerts and access to results. When it ends, if you do not subscribe at /subscription.php, the bid list becomes limited and you will not be charged automatically.
1) Add keywords that describe what you sell. 2) Start the trial. 3) Adjust regions, delivery times and email style after signup.
Whenever possible, yes. Some official portals require login or block direct links; in those cases we point you to the official process page so you can download the documents.
Yes. You can filter by region, procurement method, dates and value ranges. You can also save preferences for future alerts and searches.
Yes. In the dashboard you can see bids on a map and use it to plan follow-up by location.
It can happen. Smart Search uses your keywords to find related opportunities, not only exact matches. Add specific terms and remove off-topic results to improve future alerts.
Yes. You can query bids via API. Documentation at /api_integration.php. Ideal for CRM, BI and automations.
In Settings you can pause alerts or adjust delivery times. If you want to delete your account, just contact us. During the free trial there is no auto-charge.
We monitor major official sources every day at the federal, state and local levels. New bid notices are added as soon as they are captured from the source portal.
Plans start at $ 43.00/month. You can begin with a free trial and there is no auto-charge.
Add what you sell, get scheduled alerts, open documents or the official page, and use filters by region and method.
Transcript
Welcome to BidHits™.
Finding public tenders and bids is important. But what really matters is quickly identifying the opportunities that match what your company sells.
To get started, enter a few keywords that describe your products or services. BidHits™ shows relevant opportunities, highlights your keywords, and organizes everything by date.
Smart search is already enabled and uses artificial intelligence to expand your results, even when the tender uses different words from the ones you searched for.
For each opportunity, you can view a summary, access documents, mark it as a favorite, add private notes, remove what is not relevant, or view it on the map.
You can also use filters, run searches, and explore the day's opportunities directly on the map.
Start using BidHits™ now. It's fast, practical, and you can try it for free.
AI Assistant
Ask me about the bid...
Loading summary...
Methodology
Unaided survey with 1051 active users, conducted through 05/16/2026.
Single question: "Would you recommend our services to a friend or colleague?" - 90% answered "yes".