This is a Request for Quote (RFQ) for the replacement of lighting and small structures at Holbrook Housing, Petrified Forest National Park. The magnitude of construction is less than $25,**** site visit is mandatory on June 11, 2026, at 9 am Arizona time. Questions must be submitted by June 15, 2026. Quotes are due by June 30, 2026. The acquisition is set aside for small businesses. Delivery is expected by September 30, 2026. The contract will be a firm-fixed-price commercial contract.
Delivery is expected by ****.
Payment will be made by NPS, IMR Arizona MABO. Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform (IPP) system.
The contractor shall warrant the solar light system for workmanship and proper application for a minimum of one year from the manufacturer's warranty effective date. The manufacturer's warranty must provide for repairs, replacement of components, or total replacement for no less than two years.
Award will be made to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government, price and other factors considered. The evaluation factors are price, technical capability, and prior experience.
To be considered for award, your company must obtain a unique entity identifier (UEI), be registered in the System for Award Management (SAM) and be considered a small business for the size standard associated with the NAICS code. The manufacturer must specialize in solar powered street/landscaping lighting, and the installer must have experience in installing solar powered street/landscaping lighting and be approved by the manufacturer.
An organized site visit is scheduled for June 11, 2026, at 9 am Arizona time. The meeting location is **** N 8th Ave, Holbrook, AZ. An organized site visit has been scheduled for site visit date and time: June 11, 2026, at 9am Arizona time
Verification samples are required for each product specified, representing the actual product, color, and finish. Verification samples: for each product specified, sample, representing actual product, color, and finish
Questions must be submitted electronically by June 15, 2026.
Failure to adhere to quotation requirements, including submission deadlines and registration in SAM, may result in the quotation being unacceptable and ineligible for award. Failure to provide sufficient technical capability or prior experience information may lead to the item being deemed insufficient or unacceptable.
The magnitude of construction is less than $25,**** of construction: less than 25, ****.