Mac - Metropolitan Airports Commission - MN
2026 EMC Plant Upgrades - This project is upgrading the chilled water system by replacing chilled water control valves with a pressure- independent model, installing a magnetic filter, installing multiple pressure sensors, and replacing tertiary chilled water pumps. It is also installing an owner- furnished condenser water pump at the EMC. Controls work includes network controller upgrades, pressure sensor monitoring on the BAS, and control valve upgrades. Electrical work includes motor starter modification
2026 EMC Plant Upgrades
Bid Close Date: