Agriculture, Department Of- Forest Service- Usda Forest Service
GAOA LDV Crystal Lakes Water & Septic Resuscitation, PSICC, Colorado - This project involves installing a new 2- inch HDPE waterline beneath Colorado Highway 24, including completing all Subsurface Utility Engineering required for CDOT permitting. Work includes connecting the new waterline from Dwelling 1 to the exist
Waterline installation and septic system repair/alteration Installation of a new 2- inch HDPE waterline beneath Colorado Highway 24, connecting it from dwelling 1 to the existing distribution system. Work includes replacing the well pump for a 15 gpm supply, installing a dual- stage booster pump and basement water storage, and performing electrical upgrades. The project also replaces multiple septic systems serving several structures, installs new sewer and dosing infrastructure, and includes asphalt removal with new road and gate installation.
Bid Close Date: