Bell County Wcid# 1
Lake Belton WTP EIP - Package 4 ( Plant 2 Sludge Collection Equipment Work Package) Package 4 consists of only Plant 2 work in bold below. Construct maintenance improvements to the Lake Belton WTP Plants 1, 2 and 4; and expand Lake Belton WTP at Plant 3 to reach a **** MGD firm capacity. Based on commitments from the Board, the following scope is included in this project: Full Plant Maintenance Scope: Plant 1 ImprovementsFlocculation Basin Baffle Wall Replacement ( remove redwood baffles and install porte
lake belton wtp eip package 4 plant 2 sludge collection equipment work package plant 2 work in bold below. construct maintenance improvements to the lake belton wtp plants 1, 2 and 4 and expand lake belton wtp at plant 3 to reach a **** mgd firm capacity. based on commitments from the board, the following scope is included in this project: full plant maintenance scope: plant 1 improvementsflocculation basin baffle wall replacement remove redwood baffles and install ported concrete walls sludge collector replacementplant 1 and 2filter backwash blower replacementchlorine scrubber installationreplacement of the existing las tanks and structural architectural improvements to provide a fabric canopy over the bulk storage area. upgrades of the sludge pump stationplant 2 improvementssludge collector replacementplant 4 maintenance improvementsreplacement of the existing las tanks and structural architectural improvements to provide a fabric canopy over the bulk storage area. 48 inch gate valve improvementplant 3 ex
Bid Close Date: