USA | TN | SHELBY COUNTY | MEMPHIS | 38108
Mata - Memphis Area Transit Authority - TN
Quality Assurance Testing
Rfp **** system integration testing ( sit) for vintage trolleys
System integration testing ( SIT) for three vintage trolleys ( 2 Melbourne and 1 Birney) System integration testing for 3 vintage trolleys: static integration tests, vehicle- infrastructure interface tests, dynamic performance tests, test report compilation, mechanical and braking integration, electrical and power integration, wayside and infrastructure interfaces, clearance and gauging verification, mechanical and pneumatic integrity, electrical isolation and continuity, emergency and safety controls
AI helper
MATA seeks proposals for system integration testing (SIT) of three vintage trolleys (2 Melbourne, 1 Birney). Work includes static, dynamic, and interface testing, with test procedures and reports. Proposals due December 10, 2026 at 11:00 AM CST. Questions due November 19, 2026. Evaluation based on qualifications (30), timeline (25), methodology (20), cost (20), references (5). Contract term December 16, 2026 to February 17, 2027. No performance bond required. Proposals valid 90 days.
Proposals must be received by December 10, 2026 at 11:00 AM CST. proposal due by: december 10, 2026 @11: 00 am cst
Payment is net thirty (30) days after acceptance. payment for the specified items shall be net thirty 30 days after acceptance.
Evaluation based on qualifications and experience (30 points), timeline (25), methodology (20), cost (20), and references (5). proposals will be evaluated on the basis of the following factors: qualifications and experience 30 points timeline 25 points methodology to provide services 20 points cost 20 points references 5 points
Proposers must provide personal qualifications, firm experience, and methodology. proposer must submit an uptodate w9 form with proposal and proposals must include all information requested in the rfp.
Protests must be submitted in writing and received seven (7) days prior to proposal closing time. proposal protests alleging restrictive specifications or improprieties which are apparent prior to proposal closing time or receipt of proposals must be submitted in writing to the contracting officer and must be received seven 7 days prior to proposal closing time
Proposals may be rejected if required forms are missing or unsigned, or if received late. missing or unsigned copies of certain forms and certifications and all rfps received after the deadline will be returned unopened.