Manhattan Beach Unified School District
B2026- 001 Playground Installation Preschool- Demolition â Demolish and dispose of existing artificial turf and gravel located within the footprint identified for the surface specified for the new playground structure. Approximately 3, 515 sq ft. Installation â Installation of Miracle Recreation Equipment â Refer to Attachment 1 MBUSD Preschool. Equipment must be installed per manufacturerâs specificationsSurfacing â Provide and install pour- in- place rubber surfacing as specified. 50/50 black and standar
playground installation preschool demolition demolish and dispose of existing artificial turf and gravel located within the footprint identified for the surface specified for the new playground structure. approximately 3, 515 sq ft. installation â installation of miracle recreation equipment â refer to attachment 1 mbusd preschool. equipment must be installed per manufacturerâs specifications surfacing â provide and install pour in place rubber surfacing as specified. 50 50 black and standard color with aromatic binder color to be selected by district. excludes designs and graphics. approximately 3, 515sqft. with an average of critical fall height cfh of 8â and in compliance with all regulations in place for california public schools. concrete â construction of concrete curb. approximately 70â linear feet. includes ledge curb along perimeter. approximately 250â linear feet total. site preparation â install drain box on south end to tie into existing storm drain. all construction shall be in compliance with th
Bid Close Date: