The Department of the Air Force, Hill AFB, Utah, intends to make a single award IDIQ contract for abatement, repair, remediation, sampling and minor construction projects. The government estimates that the volume of work will be between **** and $9,900,**** during a 5-year plus 6-month optional period of performance. The solicitation may be available on or about March 24, 2026, and the anticipated date for receipt of quotes is on or about April 23, 2026. The solicitation is set aside 100% for small businesses. All questions must be addressed via email no later than 2:00 PM MST on March 5, 2026.
Final payment net 30 will be made after final project acceptance is made by the government and after the contractor submission of all closeout project documentation, as referenced in a06, and an invoice is submitted through wide area work flow wawf. Final payment net 30 will be made after final project acceptance is made by the government and after the contractor submission of all closeout project documentation, as referenced in a06, and an invoice is submitted through wide area work flow wawf.
The award will be made to the contractor responsible who submits the most advantageous quote to the government based on a lowest priced technically acceptable (LPTA). The award will be made to the contractor responsible who submits the most advantageous quote to the government based on a lowest priced technically acceptable lpta.
All bidders must submit, for approval by the 75 CES/CEOHA office, all the necessary information requested in the attached Hill AFB asbestos/LBP abatement contractor qualifications document. All bidders must submit, for approval by the 75 cesceoha office, all the necessary information requested in the attached hill afb asbestoslbp abatement contractorqualifications document.
The contractor is required to schedule pre and post abatement visual inspections. The contractor is required to schedule pre and post abatement visual inspections.
Address any questions via email to the POCs identified no later than 2:00 PM MST on March 5, 2026. Address any questions via email to the pocs identified above no later than 2:00 pm mst on 5 march 2026.
The government estimates that the volume of work will be between **** and $9,900,**** during a 5-year plus 6-month optional period of performance. he government estimates that the volume of work will be between **** and9, 900, **** during a 5year performance period with a 6month extension option.