Separate sealed BIDS for the construction of three potable water supply wells
construction of three potable water supply wells construction of three potable water supply wells no. 7, no. 8 and no. 9 ranging in depths of 104 ft to 108 ft a new 3. 0 mgd water treatment plant wtp with a 3acre solar array and approximately 60 lf of 6inch water main, 500 lf of 8inch water main, 9, 300 lf of 14inch water main, 2, 000 lf of 4 forcemain, 260 lf of dry jack and bore with 24 casing piping, and 162 lf of 4 chemical feed conduit. the wtp building is approximately 9, 239 sf total and consists of 2, 466 sf of office area 6, 773 sf of process area housing three horizontal pressure filters, four vertical ion exchange softeners, and chlorination, phosphate and fluoride chemical feed systems, along with a solar array field consisting of 28 total arrays, each 15 ft. x 45 ft.
AI helper
The project involves the construction of three potable water supply wells, a water treatment plant, and related infrastructure. Bids are due on February 23, 2026, at 2:00 PM. A mandatory pre-bid meeting will be held on January 6, 2026. The contractor must complete the work within 540 consecutive calendar days after the notice to proceed. Liquidated damages of **** per day will be applied for delays. Bidders must provide bid security (certified check, cashier's check, or bid bond) for 5% of the bid amount. The apparent low bidder must submit a hard copy of the bid security within three days of the bid opening. The project is subject to various regulations, including those from the Illinois EPA and the Davis-Bacon Act. The contract documents are available at www. ***. *. *
The contractor shall commence work after the notice to proceed is issued and shall be completed within 540 consecutive calendar days of the written notice to proceed ntp.
Bidders are also required to comply with the presidents executive order ****, as amended.
Should the contractor fail to complete the work within such time, contractor agrees to pay and will apply to the owner for each and every day of such delay in completion of the work beyond the contract time the sum of five hundred dollars and **** **** per day for work not completed by the substantial completion date as liquidated damages.