Agriculture, Department Of- Forest Service- Usda Forest Service
Kimball Creek Culvert Replacement FR- 304 - Additional Q& A 39; s attached. The purpose of this update is to clarify the period of performance. The period of performance is 6/1/2026- 9/30/2026 with instream work done between 7/1/2026- 9/15/2026. There is
Kimball Creek Culvert Replacement 1 Mobilization 2 Construction Survey and Staking 3 Contractor Testing 4 Soil Erosion Control, Filter Bag 5 Soil Erosion Control, Silt Fence 6 Soil Erosion Control, Temporary Diversion 7 Clearing and Grubbing 8 Removal of Pipe Culvert 9 Removal of Signmarker 10 Embankment Construction 11 Structure Excavation 12 Structural Backfill 13 Placed Riprap, Method A, Class 1 14 Placed Riprap, Method A, Class 3 15 Aggregate Surface Course 16 Structural Concrete, Class A AE 17 Reinforcing Steel 18 Structural Plate Arch Corrugated Aluminum, 25 feet span, 8. 5 feet rise 19 Furnishing and Placing Topsoil, 4inch depth 20 Turf Establishment 21 Rolled Erosion Control Product, Type 1. C 22 Signs, Aluminum Panels, Type 3 Sheeting Object 23 Temporary Traffic Control
Bid Close Date: