Commonwealth Of Kentucky - Facilities & Support Services- KY
RFB- 266- 26 KSU - Walkway Improvements and Misc. Repairs
Bid Close Date:
Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** Shauntee Hall is a two- story classroom building, originally built in 1971. The current renovation aims to comprehensively overhaul the building to enhance its mechanical, electrical, plumbing systems, overall functionality, aesthetics and make it fully accessible. The minimal exterior envelope work will be completed including existing brick veneer is to be tuck pointed, new aluminum storefront windows in some locations, repair/replacement of roof trim flashing to minimize water damage. Construction will occur in two Phases. Phase 1 scope includes: renovation of ( 1) existing lab space within an existing unoccupied building. This work is considered Phase 1 of a 2 Phase work scope. The area of the existing lab space is 1, 756 sf. The work scope includes site work including new sidewalk and concrete pad, relocation of existing exterior HVAC unit and new louvered screen wall. Interior renovation including new exterior overhead coiling door and man door and associated steel framing,. Phase 1 scope will also include unloading and placement of owner provided equipment, new electrical work to provide power from mechanical room to new CNC lab, installation of new Unistrut system for equipment power and air supply, and the installation of new ADA temporary luxury restrooms including walkway connector structure, power to the restrooms and lighting