City Of Austin - TX
An October **** storm event exposed and damaged a 16- inch reclaimed water main in Country Club West Creek on the east side of Krieg Fields, depriving the fields and a bulk fill station of reclaimed water service. Approximately 1, 150 feet of 16- inch ( 20- inch HDPE) reclaimed water main to replace a main that was damaged by flooding and erosion in the Halloween Flood of ****. Because of highly erodible soils, the preferred long- term solution is a replacement main installed below the erosion hazard zone v
Bid Close Date: