Lot 1: Mobilization
Lot 2: Remove delineator /marker
Lot 3: Remove sign
Lot 4: Remove light foundation
Lot 5: Salvage lighting unit
Lot 6: Sawing bit pavement ( full depth)
Lot 7: Remove curb & gutter
Lot 8: Remove concrete driveway pavement
Lot 9: Remove bituminous pavement
Lot 10: Remove bituminous walk
Lot 11: Remove concrete walk
Lot 12: Salvage sign panel special
Lot 13: Aggregate base ( cv) class 5
Lot 14: Mill bituminous surface ( 2. 0)
Lot 15: Type sp 12. 5 wearing course mix ( 3, b)
Lot 16: Adjust gate valve
Lot 17: Adjust frame & ring casting
Lot 18: Adjust frame & ring casting ( special)
Lot 19: 4 concrete walk
Lot 20: Drill & grout reinf bar ( epoxy coated)
Lot 21: Concrete curb ramp walk
Lot 22: Concrete curb & gutter design b618
Lot 23: Concrete curb design v6
Lot 24: 8 concrete driveway pavement
Lot 25: Truncated domes
Lot 26: Light foundation design e modified
Lot 27: 2 non- metallic conduit
Lot 28: Underground wire 1/c 2 awg
Lot 29: Underground wire 1/c 4 awg
Lot 30: Underground wire 1/c 6 awg
Lot 31: Install lighting unit
Lot 32: Traffic control
Lot 33: Install sign
Lot 34: Delineator /marker panel
Lot 35: Sign
Lot 36: Install sign panel special
Lot 37: Stabilized construction exit
Lot 38: Storm drain inlet protection
Lot 39: Sediment control log type straw
Lot 40: Fertilizer type 3
Lot 41: Seeding
Lot 42: Hydraulic stabilized fiber matrix
Lot 43: Rapid stabilization method 3
Lot 44: Seed turfgrass
Lot 45: 4 solid line paint
Lot 46: 6 solid line paint
Lot 47: 24 solid line paint
Lot 48: 4 broken line paint
Lot 49: 4 dble solid line paint
Lot 50: Pavt mssg paint
Lot 51: Crosswalk paint