This addendum extends the bid date to August 19, 2026, at 10:00 am. State funds through stormwater competitive grants are being utilized. Vendors suspended or debarred are excluded. Revisions include changes to excavation procedures, on-site electric installation requirements, pipe installation details (HDPE and dip pipe), wildflower sod installation, and the addition of timber bollards. Contractors must comply with federal Byrd Act certification.
The bid date has been extended to Wednesday, August 19, 2026, at 10:00 am. this addendum is being issued to extend the bid date to wednesday, august 19, 2026, at 10: 00 am
Payment for over excavation is made for surface areas constructed, measured in square yards, at the bid price per square yard. payment for over excavation, if and where directed, will be made for the surface areas thereof actually constructed within the limits prescribed by the engineer, measured in square yards, at the price per square yard bid for base repair in the proposal.
Vendors currently suspended, debarred, or disqualified are excluded from participation on this project. under n. j. a. c. 7: 1d, vendors currently suspended, debarred, or disqualified are excluded from participation on this project.
As liquidated damages for delay, the contractor shall pay the owner 0. 10 of the contract price for contracts over $200,**** for each day of delay. accordingly, instead of requiring any such proof, the owner and thecontractor agree that as liquidated damages for delay but not as a penalty the contractor shallpay the owner 0. 10 of the contract price for contracts over 200, **** or two hundreddollars **** for each day that expires after the time specified in paragraph 3. 1 for completion, untilthe work is complete.
Failure to submit required documents, such as the federal byrd act certification, is a mandatory cause for the bid to be rejected. a. failure to submit the following documents is a mandatory cause for the bid to be rejected.