City Of Hastings - NE
Install New Underground Conduit NDS HU 2026- 11 - Install new Underground Conduit from the City Auditorium to North Denver Station and from North Denver Station to the Utilities Warehouse HU 2026- 11
installation of new underground conduit from the city auditorium to north denver station and north denver station to the utilities warehouse install approximately 6, 500 linear feet of conduit for a new fiber optic route by means of horizontal directional drilling. twelve inground pull boxes with tracer wire test stations are to be incorporated at various locations to break up the project into manageable lengths or replace existing smaller vaults. all of the inground pull boxes will be interconnected by two 6, 500 bore x 2 13, 000 of duct 1 conduits, with some locations connected by three conduits. terminating the conduits that exit pull boxes to serve a facility building are also specified in the drawings. locations and materials are detailed specifically in the attached drawings.