City Of Corpus Christi
Industrial Reuse/ Water Reclamation/ Reclaimed Water/ Water Infrastructure
RFP **** Construction Manager At Risk for Corpus Christi Water Reclaimed Water for Industrial Reuse Ardurra Group, Inc. is seeking a qualified Construction Manager at Risk ( CMAR) to provide construction manager at risk services in connection with the final design and to perform the construction of the Reclaimed Water for Industrial Reuse Project. The estimated construction cost for this project is $ 108 million dollars. Each Proposer is required to submit a Qualifications Packet and a Cost Proposal separat
Construction Manager at Risk for Corpus Christi Water Reclaimed Water for Industrial Reuse
Bid Close Date: