Lot 1: Color audio/video recording, pre & post construction
Lot 2: Clearing and grubbing
Lot 3: Trench excavation and backfill - 0 to 10 feet
Lot 4: ( rcp) storm sewer ( 30 inch) " o" ring
Lot 5: Design 2- 4 inlet complete in place
Lot 6: ( 6 inch) ( pvc) waterline pipe ( push- on joint) ( dr- 14)
Lot 7: Fittings ( 6 inch x 45 degree bend)
Lot 8: Fittings ( 6 inch solid sleeve)
Lot 9: Sanitary sewer pipe ( 8 inch) ( sdr- 26)
Lot 10: Sewer service connction
Lot 11: Sewer service line
Lot 12: Sewer flow control
Lot 13: Deflection test (
Lot 14: Television inspection ( cctv) ( pre const. )
Lot 15: Television inspection ( cctv) ( post const. )
Lot 16: Sewer leakage test (
Lot 17: ( 4 foot dia. ) sanitary sewer manhole ( 0- 6 feet)
Lot 18: Extra depth manhole wall ( 4 foot dia. )
Lot 19: Manhole testing (
Lot 20: Sanitary sewer manhole rehabilitation ( 4 foot dia. )
Lot 21: Setting new manhole ring and cover
Lot 22: Removing manhole ( 4 foot)
Lot 23: Bore and steel encasement ( 8 inch carrier) ( excluding sewer)
Lot 24: Construction staking ( construction survey)
Lot 25: Gps " as- built" survey
Lot 26: Construction signing & traffic control
Lot 27: Mobilization
Lot 28: Structure removal ( design 2- 4 inlet)
Lot 29: Pavement cut and permanent repair ( asphalt)
Lot 30: Remove and replace sidewalk ( 4 inch)
Lot 31: Remove and replace driveway ( 6 inch)
Lot 32: Remove and replace curb ramp ( 8 inch)
Lot 33: Remove and replace tactile warning device
Lot 34: Remove and replace curb & gutter ( 6 inch barrier)
Lot 35: Integral curb ( 6 inch barrier)
Lot 36: Temporary erosion control
Lot 37: Solid slab sodding