USA | WA | KITSAP COUNTY | SILVERDALE Small City
Shipyard Infrastructure Optimization Program Multi- Mission Dry Dock, Multiple Award Construction Contract - Title: Shipyard Infrastructure Optimization Program Multi- Mission Dry Dock, Multiple Award Construction Contract Type: Pre- Solicitation Notice Location: Pr
Shipyard infrastructure optimization program multi- mission dry dock construction Construction of a new proposed multi mission dry dock in support of SIOP requirements at PSNS IMF, located at NBK Bremerton, Washington. This includes dry dock drainage, dewatering, and flooding systems, caisson roadways and rail networks, portal crane track access and egress elements, mechanical, electrical, and communications systems, support buildings, and utility routing tunnels. The project also includes demolition of facilities and utilities.
AI helper
The contract is for the construction of a multi-mission dry dock at PSNS IMF, NBK Bremerton, WA. The maximum possible duration is 10 years with an aggregate maximum estimated value of $15,000,000,000. Evaluation factors include technical approach, experience, past performance, small business utilization, and price. Offerors must demonstrate bonding capacity of $1,000,000,000 single project and $3,000,000,000 aggregate. Proposals are due in December 2026.
The anticipated evaluation factors include: factor 1 technical approach acceptable unacceptable factor 2 experience factor 3 past performance factor 4 small business utilization and participation factor 5 safety acceptable unacceptable price
Offerors will need to demonstrate single project bonding capacity of 1, 000, 000, 000 and an aggregate bonding capacity of 3, 000, 000, 000.
an aggregate maximum estimated value of 15, 000, 000, 000 for all task orders