Mustang Special Utility District
Heated Shop Space
Mustang SUD Operations Building D ( CMAR) Construction of a high- performance Pre- Engineered Metal Building ( PEMB) 168 ft by 80 ft at the Mustang SUD headquarters. The facility to be engineered to bridge industrial- scale functionality with high- efficiency conditioned spaces in full compliance with 2021 IECC ( Climate Zone 3) energy standards. Building to be durable 26- gauge PBR metal enclosure including drive- through bays and semi- heated shop space. Bay areas are to be included for four general mecha
Construction of a high performance pre engineered metal building
Bid Close Date: