City Of Laredo
Informal: FY26- ENG- 30: Roots Detox Center Modular Units - The City of Laredo reserves the right to reject any and all bids, and to waive any minor irregularities. ** If the bidder submits both an electronic bid and a properly completed manual bid, the Purchasing Division will use the electronic bid to determine the total bid amount of the bid. If the bidder submits an electronic bid and a manual bid that is not complete, the Purchasing Division will use the electronic bid to determine the total bid amount
Roots Detox Center Modular Units 1. Finishout concrete piers ( 24 units) 2. Finishout flooring system driveway ( 384 sq ft) 3. Finishout building envelope ( lump sum) 4. Finishout thermal barriers wall assembly insulation ( lump sum) 5. Finishout thermal barriers ceiling assembly insulation excavation ( lump sum) 6. MEP climate system air conditioning equipment ( 4 units) 7. MEP climate system structural support brackets ( 4 units) 8. MEP climate system dedicated circuits ( 170 linear ft) 9. ADA ramps ADA wooden ramps brackets ( 4 units) 10. ADA ramps rest platforms safety railings ( 4 units) 11. Estimated time in working days to complete project after notice of receipt to proceed. Allowance: utility and contingency of $ 5, **** will be added to the grand total for each bid submittal.
Bid Close Date: