City Of Milwaukee - WI
Speed Hump Installation
OFFICIAL NOTICE 63- 1- 2026 The general work requested is: THE CONSTRUCTION OF; 4" ASPHALT ROADWAY RECONSTRUCT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5" CONCRETE WALK, DETECTABLE WARNING FIELDS, 7" CONCRETE DRIVEWAY, CRUSHED STONE BASE, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, CONCRETE TRAFFIC ISLAND, PINNED- ON TRAFFIC CIRCLES/TRAFFIC ISLAND AND SPEED HUMPS; EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, MANHOLE INLET ADJUSTMENTS, ETC. ; Located at: **** W. Arizo
Bid Close Date: