Belton- Honea Path Water Authority - Ardurra
WTP High Service Pumping Improvements - The work will consist of improvements to the existing high service pumping capabilities at the Water Filtration Plant as follows: 1. Installation of a vertical turbine pump capable of conveying 2, 800 gallons per minute ( GPM) at 325 feet total dynamic head ( TDH). 2. Installation process piping and valves. 3. All related instrumentation, electrical equipment and wiring.
High service pumping improvements Installation of a vertical turbine pump ( 2, 800 gpm at 325 ft tdh), process piping and valves, related instrumentation, electrical equipment, and wiring for water filtration plant.
Bid Close Date: