Cromwell Fire District - CT
Cromwell Fire District - Water Interconnection Project - The installation of two interconnection stations to connect the Cromwell Fire District, Water Division system to neighboring public water systems. Work includes but is not necessarily limited to the installation of subgrade concrete foundation; furnishing and installing the prefabricated bodies of two interconnection stations; installing approximately 2, 060- feet of inch ductile iron water main via open trench; hanging approximately 170 feet of insul
Water interconnection project - installation of two interconnection stations to connect Cromwell Fire District water division system to neighboring public water systems Installation of subgrade concrete foundation; furnishing and installing prefabricated bodies of two interconnection stations; installation of approximately 2, 060 feet of 12- inch ductile iron water main via open trench; hanging approximately 170 feet of insulated 12- inch ductile iron water main at bridge crossing; structural appurtenances; water main connections; gate valves; hydrants; backfill material; CTDOT road restoration; surface restoration; loaming and seeding
Bid Close Date:
Lot 1: 12- inch Ductile Iron, CL 52 pipe
Lot 2: 8- Inch Ductile Iron, CL 52 pipe
Lot 3: 6- inch Ductile Iron, CL 52 pipe
Lot 4: 12- inch Ductile Iron, Bridge Hanging