Commonwealth Of Kentucky - Facilities & Support Services - KY
Rfb- 118- 27 ****, breathitt county
Construction services for abandoned mine land abatement in Breathitt County Construction services including access road construction, safety fence removal and installation, concrete work around air shaft pipe, rebar safety closure installation, site preparation, clearing and grubbing, silt barrier installation, revegetation, and road stone placement
Bid Close Date:
Lot 1: ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded Abatement plans will consist of building an access road to the air shaft. The old safety fence will be removed. The air shaft pipe that is standing out of the ground will be surrounded in concrete and a new rebar safety closure will be installed over the air shaft. A new 6 ft. height safety fence will be installed with no access gate and waring sign are to be posted on the fence when the project is completed. Mobilization is set up to provide construction equipment to be delivered to the site. Site Prep is set up for the for clearing and grubbing to build an access road to the mine slope opening. Epoxy coated 60 KSI Reinforcing Steel Coated is set up for the rebar for the concrete wall that will surround the air shaft pipe and the rebar cage on top of the air shaft. Concrete Formed and Finished is set up for the concrete wall that will surround the air shaft pipe. Silt Barrier is included to prevent dirt and debris from leaving the work site. Revegetation is set up for reseeding the disturbed area after the construction is complete. Road stone is set up for access road maintenance. Chan Link Fence is set up to provide a secure safety area with no access to the air shaft around the opening. Any permits will be obtained prior to construction. If required, AML will elect to make a voluntary payment to the Imperiled Bat Conservation Fund in accordance wi