Oregon Buys - Confederated Tribes Of Siletz Indians - OR
CTSI Swan Ave Road Resurfacing and Stormwater Improvements Project
Road resurfacing and stormwater improvements Mobilization/Demobilization 1 LS Temporary Work Zone Traffic Control **** Foot Erosion Control 1 LS Construction Survey Work 1 LS Removal and Disposal of Pipes 4 Foot Removal and Disposal of Curb and Gutter 109 Foot Removal and Disposal of Curb 71 Foot Removal and Disposal of Walks and Driveways 211 SqYd Removal and Disposal of Inlets 4 Each Removal and Disposal of Manholes 3 Each Asphalt Pavement Sawcutting, 3 inches deep **** Foot Concrete Sawcutting, 4 inches deep 51 Foot Clearing and Grubbing 1 LS Embankment in Place 167 CuYd Loose Riprap, Class 50 11 CuYd 10 inch Culvert Pipe, 5 ft depth 129 Foot 24 inch Storm Sewer Pipe, 5 ft depth 146 Foot 24 inch Storm Sewer Pipe, 10 ft depth **** Foot 24 inch Storm Sewer Pipe, 20 ft depth 722 Foot 3 inch PVC Pipe, 5 ft depth 21 Foot 6 inch PVC Pipe, 5 ft depth 53 Foot 8 inch PVC Pipe, 5 ft depth 44 Foot 12 inch PVC Pipe, 5 ft depth 582 Foot Concrete Storm Sewer Manholes 10 Each Concrete Manholes, Shallow 2 Each Concrete M
Bid Close Date: