Wsdot - Washington State Department Of Transportation - WA
2027 CRISI Rural Rail Rehabilitation - PV Hooper Branch - PCC Contract summary Improvement of railroad crossings and mainline track work along the PV/Hooper Branch of the PCC Railroad system by removing crossings, turnouts, rail, ties, cleanup and disposal of legacy material and roadway excavation, installing CSBC, CCP and HMA paving, pavement markings, culverts, ballast distribution, ties, replacing rail with OTM, rail joints, surface line and dress, undercutting, turnouts, crossing replacement, surveying
Bid Close Date: