Department Of Environmental Protection - PA
Sediment Control/ Stormwater Management
Amrp Murrinsville1 2 Venango Marriontwp Butlercnty - The Principal Items Of Work And Ap The Principal Items Of Work And Approximate Quantities Are Implementation Of The Erosion And Sediment Pollution Control Plan Rock Construction Entrance 1 Each Implementation Of The Erosion And Sediment Pollution Control Plan Compost Filter Sock 32 Diameter 8 034 L F Implementation Of The Erosion And Sediment Pollution Control Plan Weighted Sediment Filter Tube 260 L F Fence 1 742 L F Clearing And Grubbing 56 3 Acre B
Implementation of erosion and sediment pollution control plan, grading, channel excavation, planting, and construction surveying for the AMRP Murrinsville project rock construction entrance, 1 each; compost filter sock 32 diameter, 8, 034 l. f. ; weighted sediment filter tube, 260 l. f. ; fence, 1, 742 l. f. ; clearing and grubbing, 56. 3 acre; brush barrier, 3, 900 l. f. ; dewatering impoundment, 1 l. s. ; subsurface drain, 3, 083 l. f. ; grading, 509, 000 c. y. ; hummocky piles, 19. 5 acre; ripping, 15. 9 acre; permanent channel excavation, 574 c. y. ; erosion matting, 1, 432 s. y. ; planting preparation, 56. 3 acre; tree seedlings, 24, 072 each; grass seed, 1, 136 lb. ; construction surveying, 1 l. s.
Bid Close Date: