Carteret County is seeking competitive bids for HVAC and roof insulation repairs at the Superior Court courthouse. The scope includes HVAC replacement, roof insulation, and ceiling repairs. A prebid meeting is scheduled for September 10, 2026. Bids must be submitted by September 22, 2026, at 9:00 am EST. The contract will be awarded to the lowest responsible, responsive bidder, considering quality and performance. A 5% bid bond is required.
Bids must be delivered no later than September 22, 2026, at 9:00 am EST. no later than september 22, 2026, at 9: 00 am est.
Payment will be made in one lump sum within thirty consecutive days after acceptance of the work. a payment will be made in one lump sum within thirty 30 consecutive days after acceptance of the work
The contractor shall unconditionally guarantee materials and workmanship against patent defects for a period of twelve months following the final acceptance of the work. a contractor shall unconditionally guarantee materials and workmanship against patent defects arising from faulty materials, faulty workmanship or negligence for a period of twelve 12 months following the final acceptance of the work
The contract will be awarded to the lowest responsible, responsive bidder, taking into consideration quality, performance, and the time specified in the bid for performance of the contract. carteret county intends to award the contract to the lowest responsible, responsive bidder, taking into consideration quality, performance, and the time specified in the bid for performance of the contract.
Contractors must comply with all applicable federal, state, and local laws prohibiting discrimination in employment. the contractor shall comply with all applicable federal, state, and local laws prohibiting discrimination in employment
For each day in excess of the allotted time, the contractor shall pay the owner liquidated damages. for each day in excess of the above date, the contractor shall pay the owner the amount of five hundred dollars **** for base bid and alternate 5 scope of work one thousand dollars **** for alternates 1, 2, 3, 4 scope of work as liquidated damages
A prebid meeting and site visit will be held onsite at 302 courthouse square, Beaufort, NC on September 10, 2026, beginning at 8:00 am EST. a prebid meeting and site visit will be held onsite at 302 courthouse square, beaufort, nc **** onseptember 10, 2026 beginning at 8: 00 am, est.
Failure to provide timely notification of lost/stolen badges/keys may result in additional liability for any damages. failure to provide timely notification may result in additional liability for anydamages, cost, or security risk incurred by the county as a result of the delay.