Turnkey installation of a minimum **** kW DC ground-mounted solar PV array at the Ward O'Hara Agricultural Museum, Auburn, NY. Bids due November 9, 2026 at 10:00 AM. Project must be completed by May 1, 2027. Total project cost shall not exceed $76,**** gross. Net cost after incentives not to exceed $72,**** inspection after construction. Site walk available upon request. Award to lowest bidder. NYS prevailing wage requirements apply.
The project shall be completed no later than May 1st, 2027. The project shall be completed no later than may 1st, 2027.
Contractor shall be paid on a time and materials method of payment. contractor shall be paid on a time and materials method of payment.
Modules: 25-year power output, 10-year workmanship. Inverter: 10-year limited warranty. Workmanship: minimum 5-year limited warranty. modules: 25year power output 10year workmanship limited warranty inverter: 10year limited warranty. workmanship: minimum 5 year limited warranty
Project will be awarded to the lowest bidder. project will be awarded to the lowest bidder to promote the public interest
Respondents must have demonstrated experience in designing, planning, scheduling, permitting, and constructing complete solar PV systems. respondents shall have demonstrated experience in designing, planning, scheduling, permitting, and constructing complete solar pv systems
Contract may be cancelled at the successful proposer's expense upon nonperformance or poor performance on ten calendar days written notice. a contract may be cancelled at the successful proposers expense upon nonperformance or poor performance of the contract on ten 10 calendar days written notice.
Site walk requests can be submitted via email. please submit site walk requests via email to amanda ogrady, aogrady@cayugacounty. gov.
Requests for written interpretations must be received by the purchasing agent at least seven days prior to the opening. to be given consideration must be received by the purchasing agent at least seven 7 days prior to the date set for the opening.
Email submissions will not be accepted and will disqualify the bidder. email submissions will not be accepted and will disqualify the bidder, even if a physical copy is also received.
The total project cost shall not exceed $76,**** gross cost prior to incentives. the total project cost, inclusive of all labor, materials, equipment, and construction services shall not exceed 76, **** gross cost prior to incentives.